Interior Remodel in

Grandville, MI

A stunning remodel that increased the functionality and long-term value of the home.

About the project

This extensive interior remodel in Grandville, MI, focused on updating and enhancing all of the main living spaces. The project included a complete kitchen redesign, where existing bulkheads were removed and cabinetry reconfigured to optimize the layout. To tie the home together, we installed new Luxury Vinyl Plank (LVP) flooring, doors, and a fresh paint scheme throughout the entire main floor. Finally, we executed two full bathroom remodels for this home, including a custom tiled shower, to deliver a beautifully updated and stunning home interior. 

Date

JANUARY 2025

Client Name

RISHAD A.

Location

GRANDVILLE, MI

solarium tear out
new flooring installation
interior remodel mid-process
remodel entryway living room

Our Work in Action

  • Custom Kitchen: We completely demoed the old kitchen, reconfigured the cabinetry and island, and installed beautiful new quartz countertops. 

  • Seamless Floor-to-Ceiling Finishes: The entire main level received new LVP flooring, shoe molding, doors, and rich paint on all walls and ceilings. 

  • Dual Bathroom Transformations: Both bathrooms were fully redesigned with new vanities, fixtures, and a bold custom tile shower.

Finished Multi-Room Remodel

Finished TimberTech PVC deck with white aluminum railing at a lakefront home in Middleville, MI
Project Spotlight

Deck Replacement in Middleville, MI

We rebuilt every deck on this lakefront home in TimberTech PVC. Four decks, a front porch, and a beach patio, all replaced down to the framing.

About the Project

The original composite decking and vinyl railing on this lakefront home in Middleville were worn out. So we replaced all of it. TPC Construction did a full deck replacement covering every outdoor surface on the property: the stairs and walkway by the driveway, expanded rear deck, front porch, and beach patio with bench.

We didn't just lay new boards over the old framing. We took each structure down to the ground and re-framed it, then sealed every joist with butyl joist tape before replacing the first board. The new decks are TimberTech PVC decking with TimberTech Impressions white aluminum railing. Risers, fascia, and rim board are color matched PVC. We also used hidden fasteners everywhere, so you won't find a screw head anywhere on the finished deck.

The rear deck also got bigger. We joined the master bedroom deck to the main rear deck and pushed the main platform out 10 feet from the house, while keeping a 4 foot walkway off the kitchen and dining area. While we were there, we replaced the sunroom’s three support posts on new 42‑inch footings and swapped out six exterior and garage doors.

Date
2026
Client Name
Mike N.
Location
Middleville, MI
Service
Deck Replacement & Exterior Renovation
Completed deck replacement in TimberTech PVC decking at a Middleville, MI lakefront home TimberTech PVC decking with white aluminum railing installed by TPC Construction Rebuilt deck surface in PVC decking with concealed fasteners, Middleville MI Exterior renovation and deck replacement project by TPC Construction in Middleville, MI

Our Work in Action

  • Complete Demo & Re-Framing: We pulled out the old composite decking, vinyl railing, and framing at every location and hauled it away. Next, we built new framing instead of re-surfacing the old one.
  • An Expanded Rear Deck: We connected the master bedroom deck to the main rear deck and extended the platform to 10′ from the house, keeping a 4′ walkway from the kitchen and dining area.
  • TimberTech PVC, Top to Bottom: PVC deck boards on every stair, landing, platform, and boardwalk. Risers, fascia, rim board, and retaining wall caps are all color matched PVC.
  • Hidden Fasteners Throughout: Every board was installed with concealed fasteners. No screw heads, nothing to snag.
  • Structural Sunroom Repair: Three rotted 6x6 posts came out. New 24″ footings went in, dug to 42″. Then we patched the concrete and power-washed it to match the existing exposed aggregate.
  • Door Package: Six doors replaced, including fire rated steel doors to both garages, glass column doors at the green room, and brand new brushed nickel handles.

Materials & Methods Used

TimberTech PVC Decking

Fully capped PVC with no wood inside. So it doesn't soak up water, rot, or fade, which matters on a lakefront property in Michigan.

TimberTech Impressions Railing

White powder-coated aluminum railing around the whole rear deck, both sides of the stairs, and every landing.

Butyl Joist Tape

Goes on top of every joist before the decking. It seals the screw holes so water cannot get into the framing.

Concealed Fastening

Hidden fasteners on all the decking, plus color matched PVC on risers, fascia, and rim board for a cleaner edge.

The Finished Project

Middleville, MI · TimberTech PVC decking & aluminum railing · Tap any photo to see it larger

Wide view of the completed multi-level PVC deck replacement in Middleville, MI
Exterior entry and porch area rebuilt during the Middleville, MI deck replacement
Expanded main deck platform built in TimberTech PVC decking
Hardscape and retaining wall adjoining the new PVC decking
Lakeside seating and deck area rebuilt with color-matched PVC fascia
White TimberTech Impressions aluminum railing along the new deck perimeter
Underside of the new deck framing before the PVC decking went on
PVC deck stairs and walkway leading toward the rear yard
Color-matched PVC fascia and trim detail on the completed deck

Questions About Deck Replacement

How long does a deck replacement take?

A single-level deck replacement usually takes one to three weeks, from demo to the last railing section. Bigger projects with several structures, like this Middleville lakefront rebuild with four decks, a front porch, a beach patio, plus the post and door work, take longer. How much longer depends on the scope. We give you a firm schedule before demo day, and your start date is locked in when you sign the construction agreement.

Should I replace my deck or just resurface it?

If the framing is solid, resurfacing can work. But here’s the problem. Composite and vinyl decks from the early 2000s often sit on framing that has been soaking up water at every screw hole for 20 years. On this project we took everything down to the ground, re-framed, and sealed the new framing with butyl joist tape. That is the only way to be sure the structure lasts as long as the PVC on top of it.

Why PVC decking instead of composite or wood?

PVC has no wood in it. So it will not soak up water, rot, or grow mold, which matters a lot on a lake. TimberTech PVC also stays cooler on bare feet than most composites, and it holds its color far longer than stained wood. No sanding or sealing every year.

Do you replace deck framing and footings too?

Of course! We handle all the structural work. Things like re-framing, ledger and rim joist repair, new concrete footings, and post replacement. On this project we also replaced three rotted sunroom posts on new 24-inch footings dug 42 inches below grade.

What areas does TPC Construction serve?

We build decks and do exterior work across West Michigan, including Grand Rapids, Wyoming, Grandville, Jenison, Hudsonville, Caledonia, Byron Center, Ada, Rockford, and Middleville. We also service the West Michigan lakeshore.

Ready to Replace Your Deck?

Tell us about your project. We will come walk the property, talk through materials, and give you a real number. No pressure.

© Copyright 2026 TPC Construction | All rights reserved.

TPC Construction Google Reviews

contact Info

© Copyright 2026 TPC Construction | All rights reserved.